Services

Design, Testing & Commissioning Services
- Design
- CxA Services
- CxM Services
- Individual IST T&C Services
- Individual TCCF T&C Services
- Heat Load Testing Services
- Specialist Snagging Services (MEP & CSA)

White Space FitOut, telecommunication rooms & General Hospitality works
- Hot & Cold Aisle Containment Solutions
- CCTV Systems
- Access Control Systems
- Lighting & Lighting Control Systems
- WIFI Systems
- Intercom Systems
- Rack & Stack
- LV Busbar & Smart Busway
- AV / IT System Solutions
- Structured Cabling & Connectivity (Data/Fiber)
- Copper & Fiber Containments
- GRMS & Home Automation Systems
- Raised flooring & Structured Ceilings

Specialist Services
- Feasibility Studies
- Business Case Studies
- Sustainability Studies
- Flood Studies
List of Project References
Northumbria Water DC
Location: Newcastle Upon Tyne, UK
IT Load (MW): Unknown
Tier: III
Role: CxA
Completion Date: 2009

Equinix LD5 DC
Location: Slough/London, UK
IT Load (MW): 25MW
Tier: III
Role: Install/CxA
Completion Date: 2010

Cobalt Data Centre
Location: Newcastle Upon Tyne, UK
IT Load (MW): 80MW
Tier: III
Role: Install/CxA
Completion Date: 2012

Gulf Data Hub Building 1
Location: Silicon Oasis – Dubai
IT Load (MW):6.5MW
Tier: III
Role: CxA
Completion Date: 2014

Dutech Data Centre
Location: Jebel Ali, Dubai
IT Load (MW): 300 kW
Tier: III
Role: PMC/Designer
Completion Date: 2019

Apollo 1 & 2
Location: Sweihan, Abu Dhabi
IT Load (MW): 6.2MW
Tier: III
Role: TA – Install, Design, T&C
Completion Date: 2020

FAB Bank Data Centre
Location: Kizad, Abu Dhabi
IT Load (MW): 600kW
Tier: III
Role: TA – Install, Design, T&C
Completion Date: 2020

Moro 1.2 Data Centre
Location: Jebel Ali, Dubai
IT Load (MW): 400kW
Tier: III
Role: TA – Install, Design, T&C
Completion Date: 2021

Moro 2.0 Data Centre
Location: MBR Solar Park, Dubai
IT Load (MW): 21MW
Tier: III
Role: TA – Install, Design, T&C
Completion Date: 2022

Khazna Data Center – DXB3
Location: Jebel Ali, Dubai
IT Load (MW): 21MW
Tier: III
Role: TA – Install, Design, T&C
Completion Date: 2024

Edgnex data center (RUH1)
Location: Riyadh, KSA
IT Load (MW): 20MW
Tier: III
Role: System Integrator
Scope: Whitespace fit-out
Completion Date: 2024

Edgnex data center (Dmm1)
Location: Dammam, KSA
IT Load (MW): 20MW
Tier: III
Role: System Integrator
Scope: Whitespace fit-out & Structured Cabling
Completion Date: 2024/2025

Khazna Data Center (AUH6)
Location: Masdar City, Abu Dhabi
IT Load (MW): 31.8MW
Tier: III
Role: System Integrator
Scope: Central Command
Center MEP/IT fit-out
Completion Date: 2025

Equinix Data Center (DX3)
Location: DPC, Dubai
IT Load (MW): 7.5MW
Tier: III
Role: System Integrator
Scope: Whitespace fit-out
Completion Date: 2025